ITB #18-008 Deland Campus Chemistry Lab Snorkel Replacement

ITB #18-008 Deland Campus – Building 5 Chemistry Lab Snorkel Replacement

Sealed bids will be received from pre-qualified General Contractors who are ALREADY APPROVED for the provision of work related to HVAC upgrades to the fume hood system in the Chemistry Lab Building 5, located at the Daytona State College Deland Campus. Formal bid proposals will be received until 2:00PM (EST) January 23, 2018 at the offices of: Daytona State College Business Services Department 1100 Willis Avenue Building 1100 – Conference Room 123 Daytona Beach, Florida 32114 Attn: Chris Wainwright.

Bids shall be submitted fully complete with all required proposal documents, including: completed bid forms, and completed contractor's qualification statement. All bids must be in duplicate (original and one (1) copy) and must be signed, sealed (corporate seal), and securely sealed in an envelope or suitable conveyance, and clearly marked on the outside to show the date and time, and must be designated as "Deland Campus Building 5 Chemistry Lab Snorkel Replacement – ITB #18-008".

The Owner is under no obligation whatsoever to accept the lowest Bid or any other Bid submitted, and the Owner in its sole discretion may accept a Bid other than the lowest Bid for any reason whatsoever that shall seem satisfactory to the Owner. Moreover, the Owner reserves the unbridled right in the Owner's sole discretion to reject any and all Bids for any reason whatsoever that shall seem satisfactory to the Owner.

PRE-BID CONFERENCE: January 9, 2017 @ 2:00 pm at the Deland Campus, Building 5, Room 211.

links below will be active once the documents become available

Front End Docs - Available January 12, 2018

Drawings (password protected) - Available January 12, 2018

Specs - Available January 12, 2018

No Addendum:  See RFI #1 and the Questions to ITB.

RFI #1:  01/22/2018

Any additional information that comes available and responses to written questions will be answered by Addendum. Questions should be submitted to Matthew.Rodgers@DaytonaState.edu

Pre Bid Meeting

1/9

Last day for questions

1/19

Issue Addendum-if needed

1/22

Bids Due/Public Bid Opening

1/23

BOT Approval

2/22

 

Information

This project is for Chemistry Lab Snorkel replacement for Building 5 on the Deland Campus.  The project consists of replacing two hoods, minor ceiling demolition and replacement, installing chemical storage exhaust snorkels, lightning protection, and a mini-split system.  One exhaust fan to be added to the roof.  The work includes all General, Mechanical, Electrical, and other finishes.

 

Questions to ITB

Q:  Please confirm disconnect (Enclosed Switch) type.  Section 262816 in the specs says Nema 1 and Nema 3R.  Drawing E102  Note 1 says Nema 4X.

A:  Use Nema 4X.

Q: What is the password to access the drawings?

A: The password will only be given to Pre-Qualified Contractors.

Daytona State College Facebook Daytona State College Twitter Daytona State College Youtube Daytona State College Linkedin Daytona State College RSS

Daytona State College 1200 W. International Speedway Blvd., Daytona Beach, Florida 32114 (386) 506-3000

Daytona State College is an equal opportunity institution.

If you are having any difficulty accessing our website, please contact the help desk at (386) 506-3950 or helpdesk@daytonastate.edu.

Last updated: 2018-01-23T14:14:38.892Z