RFQ# 13-524 B220 Remodel with Addition


RFQ #13-524 (Request for Qualifications)

Pursuant to the provisions of Section 287.055, Florida Statutes, the “Consultants’ Competitive Negotiations Act”, Daytona State College hereby publicly announces it will consider pre-qualified professional firms, registered and licensed to do work in the State of Florida, for a project requiring Architectural and Engineering services.

 

Project Information

     The 36,000 sf Theater Center (B220) was constructed in 1966. The 2-story building includes a 450 seat theater, classrooms & labs for band, dance & other performing arts programs as well as a ceramics lab with associated kilns. The building continues to house a band/orchestra room, a scene shop, ceramics, piano lab, practice rooms, classrooms & 11 faculty offices. A plan is being formulated to relocate all current programs in the building. The mechanical systems are failing and considered un-repairable due to age and availability of parts. One portion of the building contains asbestos. The master plan calls for the remodeled building to become a new student center and cafeteria (replacing current B130 services) on the first floor & student activities spaces on the second floor. The programming of the third & fourth floor is not complete.

 

Following the Submittal Guidelines, interested firms should submit their proposal to:

Facilities Planning Dept Bldg 540 / Rm 112
Daytona State College 1200 W. International Speedway Blvd
Daytona Beach, FL 32114

    * Please note the following clarification to Tab 1(C):

Attach an audited financial statement prepared and signed by a public accountant certified in the State of Florida, including latest balance sheet and income statement showing current assets, net fixed assets, other assets, current liabilities, and other liabilities. NOTE: This will not count toward the page limit.

 

     There is no pre-proposal meeting planned. Any additional information that becomes available and responses to written questions received prior to the deadline of February 11 will be posted on this site. Questions should be submitted to nielseb@DaytonaState.edu

 

Submittals are due by 12:00 p.m., February 15, 2013.

Committee Review: February 18, 2013 @ 8:00am

Short List Notification: February 20, 2013

Oral Presentations/Interviews: March 4, 2013

Proposed BOT Approval: March 21, 2013

 

Questions to RFQ

Q: Is it possible to do a site visit prior to the RFQ submittal date?

     A: Site visits will be limited to the short listed firms only.

Q: There is not enough room to fill in the information.

     A: Pleae download the associated forms and fill them out.  DO NOT FILL OUT THE FORMS BY HAND EXCEPT WHERE SIGNATURE IS REQUIRED.

Q: Does the College require true legal Joint Ventures of architecture firms that team for the project or is a typical teaming arrangement with MOU acceptable?

     A: A typical teaming arrangement with MOU is acceptable.

Q: Are there any other improvements anticipated for the theater auditorium or stage area?

     A: It is anticipated that the first floor will become a cafeteria/student space. Final uses of all spaces will be determined during the programming phase.

Q: How many students will occupy the proposed cafeteria?

     A: That will be determined during the programming phase.

Q: Please confirm the 3rd & 4th floors apply to the proposed addition?

     A: It is anticipated that the remodeled building will have a 3rd & 4th floor.

Q: Where can I view the current Master Site Plan?

     A: Click here for the MSP.

Q: Will the existing theatre/auditorium/stage area continue to be used as such in the final product or will that space be remodeled into another use?

     A: That will be determined during the programming phase and be remodeled into another use.  See project description for first and second floor uses.

Q: Will the Construction Manager be brought on board during the programming phase to assist with project budgeting from programming through design?

     A: Construction funding has not been appropriated at this time. We do not anticipate the selection of a Construction Manager until construction funding has been appropriated.

Q: Will the team be required to provide cost estimating services for parallel comparison with the Construction Manager’s preconstruction estimating?

     A: Until the Construction Manager is brought on board the Design Team will be responsible for cost estimates. When the Construction Manager is brought on board that responsibility will be shifted to the Construction Manager.

Q: Will this building be LEED certified, and if so, what is the minimum level to be achieved?

     A: This building will not be a LEED certified project. Currently the College is using the Green Globes rating system.

Q: Can you clarify the Tab 1(C) requirements?

     A: Attach an audited financial statement prepared and signed by a public accountant certified in the State of Florida, including latest balance sheet and income statement showing current assets, net fixed assets, other assets, current liabilities, and other liabilities. NOTE: This will not count toward the page limit.

Q: Do we need a theater consultant on our design team?

     A: No.

 Q: Is there an approximation to the size of the food service component and dining area?

     A: No.  That will be determined during the programming phase.

Q: Do we to fill out Tab 8 if we are NOT a Joint Venture?

     A: No

 

Last Updated: 2/12/13